+86-574-58220516
enLanguage

Latest Products

  • Electrofusion Coupler For Water And Gas
  • Electrofusion End Cap For Gas And Water
  • Electrofusion 45degree Elbow For Gas
  • Electrofusion 90degree Elbow For Gas
  • Electrofusion Equal Tee For Gas And Water
  • Electrofusion Reducing Tee For Gas And Water

Contact Us

  • Luojiang Village, Hemudu Town, Yuyao City, Zhejiang Province, China
  • export@hypiping.com
  • +86-574-58220516
What is Butt Fusion Fitting?

 

Butt fusion (sometimes called heat welding, butt welding or simply fusion) is a welding process used to join two different pieces of a thermoplastic. This process involves heating both pieces simultaneously and the two surfaces are then brought together under controlled pressure for a specific cooling time and a homogeneous fusion joint is formed.

 

Why Choose Us

Excellent Product Quality

High density polyethylene (HDPE) fittings and ball valves which are widely used in domestic gas industry with a high market reputation, also exported to Europe, Australia, Middle East, Asia and other countries.

 

Rich Experience In Production

We are a fully-fledged ISO certified company with more than 10 years' experience in manufacturing, with full lines of products, innovative R&D team, Ningbo Hengyuan are keen to be your one-stop factory for HDPE fittings, ball valves and other special requirement.

After-Sales Service

Since its establishment, our company has been adhering to the scientific outlook on development, technology research.

 

 

Competitive Advantage

Adhering to the concept of a high starting point and high investment, Hengyuan Precision introduced more than 40 Haitian large-scale injection molding machines, built a first-class servo system and introduced advanced manipulator equipment.

 
The Butt Fusion Fitting Sequence Can Be Broken Down In To The Following Principal Steps
 
01/

Cleaning: The pipe ends are cleaned to remove physical contamination deposited during transport, handling or storage and then placed in the welding machine. Cleaning should, if possible, be undertaken using disposable lint free wipes containing at least 99% Isopropyl Alcohol (IPA). Wipes having a lower percentage of IPA (e.g. 70%) should not be used as they leave moisture on the cleaned surfaces, which interferes with the fusion process.

02/

Clamping: Pipes are clamped into the welding machine. One side is fixed and one side can move. Once clamped, the ends are brought together to check the ovality of the pipe ends and their alignment. Adjustments are made, if needed.

03/

Trimming: The pipe ends are pressed against a trimmer tool which planes the ends to remove oxidised material or contaminants and ensure that they are smooth and parallel to each other and the hot plate.

04/

Alignment: After trimming, checks are made that the pipe ends butt squarely against each other without any gaps and that any offsets are within allowed limits. If the pipes are not correctly aligned then their alignment must be adjusted and the ends trimmed again, before alignment is again checked to ensure it is within the allowed limits.

05/

Heating: The pipe ends are pressed against an electrical hot plate at a set temperature and pressure to form contact, after which heat is allowed to soak into the ends of the pipes, melting them and forming a small weld bead. The length of time for which the pipe ends are kept in contact with the hot plate depends on the pipe diameter and wall thickness.

06/

Fusion: Once the heating time is complete, the hot plate should be removed and the pipe ends pressed together as quickly as practical, to minimise the changeover time. This prevents significant cooling of the ends, which could lead to a ‘cold joint’. The interface pressure at the pipe ends is created and maintained by the welding machine's hydraulic system. It will vary depending on which welding procedure is being followed. During this process a weld bead is formed both on the inside and outside faces of the pipe.

07/

Cooling: The pipe ends and fusion joint are immobilised in the welding machine clamps whilst the material cools and reforms its crystalline structure. Only then are they removed from the machine. The cooling time mainly depends on the pipe diameter and wall thickness.

08/

Debeading and testing: On completion, the internal and external weld beads can be removed, if required. Non-destructive tests can be applied to the weld bead and sometimes to the fusion joint itself to assess the quality of each weld. Some technical specifications require the cutting out and destructive testing of a small proportion (1 or 2%) of the joints.

 

Process Of Butt Fusion Fitting

 

 

1
productcate-1-1

Pipe Preparation

The ends of the pipes to be joined are cut square and cleaned to remove any dirt, debris, or oxidation. This ensures a clean, uncontaminated fusion surface. The fusion machine then uses a facer/cutter to cut the pipe back to original resin.

2
productcate-1-1

Heating

A butt fusion machine is used to heat the ends of the pipes. This machine features heating plates that are in direct contact with the pipe ends, allowing them to reach the required fusion temperature.

3
productcate-1-1

Fusion

Once the pipe ends are heated to the appropriate temperature, they are quickly brought together, creating a melt zone. This molten material fuses together, forming a seamless connection as it cools down.

4
productcate-1-1

Cooling and Consolidation

After fusion, the pipe and fitting are held in place while the material cools and consolidates, ensuring a strong and homogeneous joint.

 

dn355-butt-fusion-22-5degree-elbow-for-water9c98f

The Procedure for Butt Fusion Fitting

 

 

Preparation of pipe ends

Cut the pipe to the desired length and chamfer or clean both ends of the pipe using a trimmer or other applicable tools. Both pipe ends must be cleaned and dust free.

Pipe Alignment

The pipes are aligned using alignment clamps to ensure that both pipes are in the same level.

Heating the pipe using a heating plate

Both ends of the pipe are heated using a heating plate at a constant temperature to ensure that the pipe ends are heated to the optimum level for welding.

Pipe welding

After the pipe ends are heated by the heating plate to the optimum temperature, the heating plate is removed and both ends of the pipe are welded together at constant pressure until cooled and joined together homogeneously.

Weld test

The process of testing welds is divided into destructive testing and non-destructive testing. Tensile and Bending tests will be performed to test the strength of the weld line in destructive testing. As for non-destructive testing, visual check of the pipe on weld seams and surface will be tested.

 

Applications Of HDPE Butt Fusion Fitting

HDPE butt fusion fittings find extensive applications across various industries and infrastructure projects 

 

Water and Wastewater Systems: These fittings are widely used in municipal water supply and wastewater conveyance systems, providing durable and leak-resistant connections for underground and above-ground piping networks.

 

Gas Distribution Networks: HDPE butt fusion fittings play a crucial role in gas distribution systems, ensuring secure and reliable joints for natural gas and liquefied petroleum gas (LPG) pipelines.

 

Industrial Pipelines: From chemical processing plants to mining operations, HDPE butt fusion fittings are employed in industrial pipelines to facilitate efficient fluid transport while withstanding corrosive substances and varying operating temperatures.

 

Irrigation and Agriculture: Agricultural irrigation systems benefit from the use of HDPE butt fusion fittings, enabling the creation of robust connections for water distribution in agricultural fields, orchards, and greenhouse facilities.

 

Infrastructure Development: Infrastructure projects, such as urban development, transportation, and construction, utilize HDPE butt fusion fittings for their versatility and durability in conveying water, sewerage, and other fluids.

 

Advantages Of HDPE Butt Fusion Fitting

HDPE butt fusion fittings offer several advantages that contribute to their widespread adoption in piping systems

Leak-Free Joints

The heat fusion process creates seamless connections, minimizing the risk of leaks and ensuring long-term performance.

Chemical Resistance

HDPE material provides excellent resistance to a wide range of chemicals and acids, making butt fusion fittings suitable for diverse industrial applications.

Smooth Interior Surfaces

These fittings maintain smooth interior surfaces, reducing flow resistance and minimizing pressure drop within the piping system.

Longevity and Durability

HDPE butt fusion fittings are known for their long service life, resistance to abrasion, and immunity to corrosion, resulting in reduced maintenance and replacement costs.

Environmental Sustainability

HDPE is a recyclable material, aligning with sustainable practices and environmental stewardship in piping infrastructure development.

 

Installation Techniques For Hdpe Butt Fusion Fitting

Proper installation practices are essential to ensure the effectiveness and longevity of HDPE butt fusion fittings

1

Pipe Preparation

Thoroughly clean and mark the pipe ends to ensure proper alignment during the fusion process. Remove any dirt, moisture, or contaminants from the pipe surfaces.

2

Heating and Fusion

Use specialized heating tools to heat the pipe ends and fitting sockets to the required temperature for fusion. Apply controlled pressure to create a homogenous joint between the pipe and fitting.

3

Cooling and Inspection

Allow the fused joint to cool gradually before conducting visual and non-destructive testing to ensure the joint's integrity and absence of defects.

4

Joint Integrity Verification

Perform pressure testing to verify the leak-tightness of the installed joints and the overall integrity of the HDPE piping system before putting it into service.

 

Why Use Butt Fusion Fitting?
 

Cost Effective
Heat-fused pipelines create leak-free systems, reduce maintenance or repair needs, and conserve resources.

 

Seamless
Fused thermoplastic pipes create a monolithic pipeline with less mechanical transitions, meaning less opportunities for leaks.

 

Longer lifespan
Thermoplastic pipes, like HDPE, are expected to last up to 100 years — saving replacement costs.

 

Corrosion Resistant
Thermoplastic pipes don't rust or corrode and are resistant to chemical abrasion.

 

Tough
Thermoplastic pipes can withstand common damages, vibrations and pressure surges.

 

Types Of Hdpe Butt Fusion Fitting
Butt Fusion 22.5degree Elbow For Water Dn400
Butt Fusion 22.5degree Elbow For Gas Dn400
Dn355 Butt Fusion 22.5degree Elbow For Gas
Butt Fusion 22.5degree Elbow For Water Dn315

Butt Fusion
Butt fusion is used when two straight pieces of pipe need to be fused together. Butt fusion is the most common and best pipe fusion method. In this method, a fusion machine holds two pieces of pipe while the ends are heated with a heater plate. Once heated, force is used to push the two ends together where they are left to cool. After the cooling process is complete, the two pieces of pipe are firmly connected and sealed. The butt fusion weld will then be stronger than the pipe.

 

Electrofusion
Electrofusion is used in tight spaces and with fittings where butt fusion cannot be used. Electrofusion couplers are needed to make this fusion connection. In this method, electrofusion couplers have copper coils inside the coupler that are then heated up to fuse to the pipe together to create a tight seal.

 

Socket Fusion
When flexibility is vital, socket fusion is used. Socket fusion involves heating the outside of a pipe while simultaneously heating the end of a socket. Once each piece is heated to the ideal temperature, the socket is then inserted into the pipe. As the two pieces cool, the connection is sealed, and flexibility remains.

 

Saddle Fusion
Saddle fusion connects the concave portion of a pipe to an inverse saddle fitting. To get a precise connection, both the concave portion of the pipe and the saddle fitting are heated. Once heated, the two pieces are joined together using force, and the piping is then allowed to cool under pressure. This heat/pressure method creates a tight seal at a complex connection point.

 

Our Factory
 

Manufacturer of high density polyethylene (HDPE) fittings and ball valves which are widely used in domestic gas industry with a high market reputation, also exported to Europe, Australia, Middle East, Asia and other countries. We are a fully-fledged ISO certified company with more than 10 years' experience in manufacturing, with full lines of products, innovative R&D team, Ningbo Hengyuan are keen to be your one-stop factory for HDPE fittings, ball valves and other special requirement. 

 

productcate-1-1

 

 

FAQ

Q: How Long Does It Take To Make A Butt Fusion Joint In Hdpe Pipe?

A: The time required to make a butt fusion joint is dependent upon the pipe wall thickness and diameter, and the field weather conditions. The thicker the pipe being joined the longer it takes to make a butt fusion joint, due to heating and cooling time requirements. An estimate on 6” DR11 pipe would be about 4 to 5 minutes to load the pipe, face it, heat it and apply the fusion force. An additional 5 to 6 minutes would be required to let the joint cool under pressure.

Q: Can Hdpe Pipe Be Fused And Installed In Sub-Zero Weather Conditions?

A: Yes, but the operator and fusion machine must be protected from the, wind, moisture or blowing snow so that the heater plate uniformly heats the ends of the pipes. Please refer to the pipe manufacturer’s recommendations for fusing and installing HDPE pipe under these conditions or the cold weather guidance in ASTM F 2620, Standard Practice for Heat Fusion Joining of Polyethylene Pipe and Fittings. For situations in which weather conditions prohibit fusion joining, mechanical connections should be considered.

Q: What type of pipe can be joined using electrofusion?

A: Polyethylene (PE)
Electrofusion is widely used in the installation of polyethylene (PE) piping for gas pressure applications. Electrofusion fitting designs vary between manufacturers and historically each manufacturer had developed and qualified its own installation procedure.

Q: What Inspection Criteria Are Used To Assure Quality Heat-Fusion Joints?

A: First, insure the fusion joint is made in accordance with PPI and/or the pipe/fitting manufacturer’s fusion procedure guidelines. This could be accomplished by recording either manually or by an electronic data logging device the critical parameters of each fusion joint and by comparing this data to the approved standard to prevent an improperly fused joint from being buried in the ground. Second, the time proven method used for field inspection of fusion joints is visual examination of the melt bead.

Q: Is there a certification required for butt fusion operators?

A: Yes, many countries and organizations require certification for individuals performing butt fusion. Operators must be trained and demonstrate competence in the procedure.

Q: How do you prepare the pipe and fitting for butt fusion?

A: Prepare the surfaces by cutting them square and clean, removing any burrs or oxide layer, and ensuring they are free from dirt and contaminants.

Q: Can butt fusion be used for all types of PE pipes?

A: Yes, butt fusion can be used for most types of PE pipes, including those made from high-density polyethylene (HDPE), cross-linked polyethylene (PEX), and other similar materials.

Q: What safety measures should be observed during butt fusion?

A: Safety measures include wearing protective clothing, using personal protective equipment (PPE), working in well-ventilated areas, and following lockout/tagout procedures when necessary.

Q: How is the quality of a butt fusion joint assessed?

A: The quality of a butt fusion joint is assessed through visual inspection for smoothness and continuity, pressure testing to check for leaks, and sometimes destructive testing to measure the joint strength.

Q: Is Extensive Training Required To Operate A Fusion Machine?

A: Most people can be trained quickly to properly fuse HDPE pipe; for assistance, refer to PPI TN42, Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Training Operators for Municipal and Industrial Projects.

Q: How Do Heat Fusion Operators Become Qualified (Or Trained)?

A: Some pipe manufacturers and authorized distributors of pipe, fittings and fusion equipment conduct training and operator qualification programs year round, both on-site and at their facilities. Details of a suggested training program are outlined in a PPI publication TN42, entitled, “Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Training Operators for Municipal and Industrial Projects.” The PPI or pipe manufacturer’s recommended fusion joining procedures must be followed to assure a quality joint is produced.

Q: Where Do I Get The Equipment To Fuse Hdpe Pipes?

A: A list of the of fusion equipment manufacturers can be obtained by contacting PPI The HDPE pipe distributor or pipe manufacturer may also be able to supply information in answer to this question.

Q: Can Hpde Service Tubing Be Joined With Mechanical Couplings?

A: Yes, mechanical couplings are commonly used on HDPE sizes 2” and below and come in a variety of installation methods such as stab type or interference fit. To maintain homogenous, leak free, and corrosion resistant HDPE service tubing systems, couplings molded from HDPE resins are preferred versus metallic (brass) couplings.

Q: How does butt fusion work?

A: During butt fusion, the ends of the PE pipe and the fitting are precisely aligned and then subjected to controlled heat from a hot plate. After a brief period, the heated surfaces are pressed together under high pressure until they cool and solidify into one continuous piece.

Q: What equipment is needed for butt fusion?

A: The essential equipment includes a butt fusion machine (with a hot plate), a fusion clamp, a fusion operator certificate, and calibrated thermometers for monitoring the temperature of the hot plate and the ambient environment.

Q: What are the steps involved in the butt fusion process?

A: The steps include cleaning and preparing the pipe and fitting surfaces, setting the correct temperature on the hot plate, aligning and joining the pipe and fitting, applying pressure, cooling, and inspecting the joint.

Q: What is the ideal temperature range for butt fusion?

A: The ideal temperature range for butt fusion is between 210°C and 230°C (410°F and 446°F). It's critical to maintain this temperature range to ensure proper melting and bonding of the PE materials.

Q: Can butt fusion be performed in any weather condition?

A: While butt fusion can be performed in various weather conditions, extreme cold or heat may affect the quality of the joint. Special precautions must be taken to maintain the recommended temperature range for the process.

Q: How do you ensure a proper butt fusion joint?

A: Ensure a proper joint by following the manufacturer's instructions, maintaining the appropriate temperature and pressure, verifying the alignment of the pipe and fitting, and conducting a visual inspection and pressure testing after the joint has cooled.

Q: What are the benefits of butt fusion over other joining methods?

A: The benefits include high joint strength, leak-free performance, cost-effectiveness due to reduced labor and materials, and suitability for a wide range of diameters and pressures.

We're known as one of the most professional butt fusion fitting manufacturers and suppliers in China. Please feel free to buy customized butt fusion fitting made in China here from our factory. Contact us for free sample.

drisco pipe fittings, Butt Fusion 90degree Elbow, mdpe pipe fusion welding

(0/10)

clearall